Per the report
"Unless otherwise noted, evaluations in this report benchmark the Argon model without out-of-model production safeguards to measure intrinsic model behavior" (page 5)
"Ultimately, if we cannot rule out that a T/CCL [Tracked or Critical Capability Level] has been reached, based on the evidence and threat models we have, we designate the model as “cannot rule out being at the CCL [Critical Capability Level]”, and mitigate accordingly." (pages 17–18)
"We cannot rule out that Gemini 4 Argon has reached this CCL [Critical Capability Level] for biological information risk, and we therefore developed a safety case for its biorisk capabilities that we assess lower risk to below the biological CCL [Critical Capability Level] level." (page 14)
A risk professional would recognize this as
As an analogy: when the underwriter can't confirm the building sits above the flood line, what is the likely presumptive assumption? The most conservative. That the building sits at or below the flood line and hence priced accordingly.